912/914 Jubilee Street

Located in Winnipeg, the 912/914 Jubilee Street project involved the construction of two side-by-side multi-unit residential infill buildings designed to maximize space, efficiency, and long-term durability. The development required precise coordination to ensure both structures were completed to the same high standard while maintaining construction efficiency.

Our team was responsible for key interior systems throughout both buildings, including:

  • Structural framing
  • Insulation installation
  • Vapour barrier installation
  • Drywall installation
  • Taping and finishing

To maintain quality and schedule alignment across both properties, we implemented an efficient sequencing approach that allowed work to progress smoothly from one stage to the next.

Because the project involved two adjacent buildings with identical layouts, consistency was essential. Our crew coordinated each phase carefully to ensure materials, installation techniques, and finishing standards were uniform across both structures. By maintaining tight sequencing between framing, insulation, vapour barrier, and drywall phases, we minimized delays and optimized workflow.

The finished development delivered comfortable, energy-efficient residential suites with consistent finishes throughout both buildings. Careful attention to detail and coordinated execution ensured a high-quality result while keeping the project on schedule.

modern Design, Bold Results

Other Projects

See the space,Feel the Vision

Each project tells more than one story — yours could be next.

Have a vision?Let’s build it together!

We help tech companies launch faster and cut costs by 35% — without compromising quality.